Stage 5 coordination is to be carried out in 3D to LOI 5 working model. This project is to carry out the full MEP services installation to two new blocks consisting of but not limited too:

  • Building Management system
  • K²n platform
  • Monodraught NVHR ventilation units
  • MVHR Ventilation units and associated ductwork
  • LTHW and Public health distribution systems
  • Drainage systems
  • Lighting systems
  • Small Power
  • Fire Alarm
  • Access control & Security
  • Lightning protection
  • Kitchen ventilation system
  • EV point

The Stage 5 element will be carried out in conjunction with Silcock Dawson.